The job
Two Big-Volume Jobs on One Campus
The first job was the gymnasium. A space that size collects equipment, furniture, and stored material for years, and all of it had to come out and get loaded without tying up the rest of the campus.
The second job was a large part of their basement — a different kind of work entirely. Basement volume has to travel: up stairs, through hallways, and out to the truck, piece by piece.
Facility work runs on schedule and access more than anything else. We plan the truck spot, the carry path, and the crew before the day starts so the building keeps running while we clear it.
What This Kind of Project Includes
- Gymnasium and large-room clearouts
- Basement and storage-area volume
- Old furniture, equipment, and shelving
- Loading, hauling, recycling, and cleanup
Photos from this job are not posted here. We only publish photos we actually took and have permission to share.
